Leaking Shower Repairs
April Showers    Waterproofing   Catalogue   Contact Info

       Step 8 - Installation of brick hob and tiling strip  

        All components that become water saturated are built within
        the shower tray.

  • The bricks are adhered inside the APRIL PVC SHOWER TRAY. The fibre cement
    sheet, used as a tiling strip, is bonded to the outside of the shower tray.

  • Use common house bricks to form the hob edge, leaving gaps at the ends for a water passage to the base of the shower tray.

  • Use a caulking gun to apply a bead of fast cure poly-urethane to secure the bricks
    and tiling strips in place.
Next Step

Return to LEAKING SHOWER REPAIRSReturn to CATALOGUE
April Showers    Waterproofing   Catalogue   Contact Info